MODBUS To FF Gateway

  • MODBUS To FF Gateway Manufacturers, MODBUS To FF Gateway Factory, Supply MODBUS To FF Gateway
  • MODBUS To FF Gateway Manufacturers, MODBUS To FF Gateway Factory, Supply MODBUS To FF Gateway
  • MODBUS To FF Gateway Manufacturers, MODBUS To FF Gateway Factory, Supply MODBUS To FF Gateway
  • MODBUS To FF Gateway Manufacturers, MODBUS To FF Gateway Factory, Supply MODBUS To FF Gateway
  • MODBUS To FF Gateway Manufacturers, MODBUS To FF Gateway Factory, Supply MODBUS To FF Gateway
MODBUS To FF Gateway
  • Microcyber
  • Liaoning, China
  • ASAP
  • 1000 units per month

G0313

G0313 Brief Introduction

G0313 Modbus to FF Gateway is a gateway device of Modbus protocol and FF protocol developed by Microcyber. As Modbus master station, G0313 Modbus to FF Gateway communicates with Modbus-RTU device via RS485 interface, and it can convert the data of Modbus-RTU device to FF device variable output.


G0313 Size

G0313产品描述(Size).jpg

G0313 Structure

G0313产品描述(Details)1.jpg


G0313 Features

  • Support 4 Modbus RTU slave devices’ access at most

  • Support AI/AO/DI/DO, each support 8 channels

  • 1 Modbus transducer block

  • 4 PID function blocks

  • 1 RES function block tallied with FF standard

  • Modbus RTU device upgrade

  • Side wiring diagram and parameter description

  • DIN rail installation


G0313 Basic Parameter

Working Temp.-20 ... +70 °C
Storage Temp.-40 °C ... +85 °C
Power Supply9 … 36 V / 14 mA@ 24 V
Dimension (L x W x H)114.5 x 22.5 x 99 mm (without connector)
InterfaceRS485
Indicator LightSYS, APL, L/A, Rx/Tx, bus-specific
EMCGB/T 18268.1
Noise InterferenceGB 9254
InstallationDIN-Rail, EN-50022 35mm x 7,5mm


G0313 Application

G0313产品描述(Application).jpg

G0313 Package and Delivery

Packaging&Shipping.jpg


FAQ
Is Microcyber A Trading Company Or Manufacture?
Microcyber's construction area of production center is 1,700 square meters, equipped with anti-static floor, ventilation system, air supply system, temperature and humidity control systems and professional production equipment....more
Get the latest price? We'll respond as soon as possible(within 12 hours)
close left right